|
||||||
| Products |
Project Patch |
| Price Lists |
|
Project Patch |
| Applications & Technical Documents |
Project Patch |
| System Integration Solutions |
|
| ||||||||||||||||||||||||||||||||||||||||
|
Swing Rack When a lack of space means you can't leave room to get behind the racks, consider Signal Transport's swing rack systems. These modular systems are designed to be mounted into framed wall openings or into millwork and provide easy access to the rear of your equipment when needed. Each rack includes a spacer panel which closes the rack and provides clearance for the rear of the equipment as it swings around. Double rack pairs share a single spacer between them; you must first open the side with the spacer, then the opposite side may be opened. Equipment depths of over 22" are accommodated. Swing racks are available in three heights: 45 RU, 15 RU, and 12 RU. Our design solves several problems with the concept of a front opening rack: the design is inherently rigid and sag resistant, requiring no wheel to support it, while capable of supporting heavy loading. Alignment is always good, meaning the rack will always close properly. Cable and power management is taken into consideration so installations can be clean and tangle free. Swing Racks have been chosen by Sony Pictures, Warner Bros Studios, Walt Disney Feature Animation, and many others. Signal Transport's Swing Racks help you create solid, professional, clean installations.
Mounting Information The success of the installation is dependent on the quality and accuracy of the millwork or framing. The framed opening must provide a 5/16" reveal at the sides of the rack to allow rotation. Please refer to the dimension table and request our mounting instruction sheet for more detail. Mounting is accomplished by first screwing the bottom and top pivot/strike plates into the cabinet or framed opening. Then the racks are put in place and the pivot pegs are extended into the bushings on the pivot/strike plates. It is important that the opening be square and plumb, and capable of sustaining the full weight of the rack at the lower corners of the frame. The top of the frame must be braced to building structure to prevent lateral movement. The tolerances of the opening should be kept to within +/- 1/8" including across the diagonals.
Project Patch | Studio Kits | Synth Driver | Modular Panel System | Swing Rack |
||||||||||||||||||||||||||||||||||||||||